1. Project architecture?
2. How did u make sure that u delivered a quality code?
3. Deployment process and tools used.
4. Which Server? Any issues with that server?
5. How is the product/site launched to production
6. Checkstyles
7. Code coverage
8. Tool for Performance measurement
9. CVS or SVN (better to attend a class on one of them). How did u use it? By commands or gui tool?
10. Unit testing. Explain the lifecycle
11. What are the other cross teams that u interacted
12. Which Quality center? What features did u use?
13. Development tool? How did u test the app in development environment.
14. Challenges faced in the project
15. Any major issue that u have solved till now?
16. Logging and reporting
17. What features of java did u use in ur project. Ex: where did u use enums, abstract class, interfaces etc.
18. What did u do as part of low level design?
19. How do u get the requirements? Low level or high level?
20. Work culture? Daily basis or task basis?
21. Status reporting to ur boss/onsite? Mails or phone communication?
22. What if u cannot meet the deadline?
2. How did u make sure that u delivered a quality code?
3. Deployment process and tools used.
4. Which Server? Any issues with that server?
5. How is the product/site launched to production
6. Checkstyles
7. Code coverage
8. Tool for Performance measurement
9. CVS or SVN (better to attend a class on one of them). How did u use it? By commands or gui tool?
10. Unit testing. Explain the lifecycle
11. What are the other cross teams that u interacted
12. Which Quality center? What features did u use?
13. Development tool? How did u test the app in development environment.
14. Challenges faced in the project
15. Any major issue that u have solved till now?
16. Logging and reporting
17. What features of java did u use in ur project. Ex: where did u use enums, abstract class, interfaces etc.
18. What did u do as part of low level design?
19. How do u get the requirements? Low level or high level?
20. Work culture? Daily basis or task basis?
21. Status reporting to ur boss/onsite? Mails or phone communication?
22. What if u cannot meet the deadline?
No comments:
Post a Comment